Draft Western Wales River Basin Management Plan 2027 to 2033
NRW
Draft Western Wales River Basin Management Plan
This is the draft summary of the River Basin Management Plan (RBMP) for the Western Wales River Basin District (RBD) for 2027 to 2033. The purpose of this plan is to protect and improve the water environment for the wider benefits to people and wildlife. The first Western Wales RBMP was published in 2009 and updated in 2015 and 2021. This is a draft of the updated plan, which is being consulted on. The final updated RBMP will be published in December 2027.
This summary RBMP includes information on progress and details of proposed changes since 2021. It includes a summary of the current status of the water environment, the reasons for not achieving good and significant water management issues. The objectives for cycle 4 are summarised along with a summary of measures. Links to detailed information are provided throughout.
1. Western Wales river basin district (RBD)
The Western Wales RBD covers an area of 16,653 square kilometres. It extends across the western part of Wales, from the Vale of Glamorgan in the south to Denbighshire in the north, shown in figure 1 below. The area is characterised by a beautiful and rugged landscape. It ranges from inland mountains, hills, lakes and valleys including Eryri and Bannau Brycheiniog National parks. It encompasses estuaries of the mid-Wales coast, the beaches and cliffs of Pembrokeshire National Park along with many national landscapes. Along with these natural landscapes the area has a strong industrial heritage, particularly in the South Wales Valleys and areas of historic metal mining such as Parys Mountain, Cwm Rheidol and Cwmystwyth. The Wales Coastal Path extends along the full coastline of the RBD.
The main centres of population are restricted to the coastal strip and the South Wales Valleys. The main urban centres include Swansea, Bridgend and Neath in the south, Aberystwyth on the coast in mid-Wales and the North Wales coast including Colwyn Bay, Rhyl, Llandudno and Bangor. The RBD is primarily rural, with land mainly used for agriculture and forestry. Marine, oil and gas industries remain important economic activities, along with commercial fisheries, shellfisheries and tourism, notably around the Welsh coastline.
Figure 1 The Western Wales RBD
The lakes, rivers, estuaries and coastal waters of the district are renowned for their fishing. The vast majority of the RBD’s coastline is designated in UK law for its environmental quality, including many world class bathing beaches and internationally important conservation sites. Many of the RBDs rivers and lakes, and all the groundwater bodies, are designated as drinking water protected areas.
There are large and valuable cockle beds at Traeth Lafan in the north and the Burry Inlet in the south. Mussels are harvested from natural beds in the Conwy and farmed in the Menai Strait. Much of the uplands are given over to livestock farming and commercial forestry. Dairy farming is dominant in the lowlands, particularly in Pembrokeshire and Carmarthenshire. The milder climate of South Pembrokeshire also allows for significant arable production.
Natural Resources Wales (NRW) will work in partnership to continue developing the understanding of local impacts and build climate change resilience and adaptation into the delivery of the RBMPs. There are a number of catchment initiatives including:
- Four Rivers for LIFE project
- The Teifi Fyw — Living Teifi: People and Nature Together project
- Uwch Conway project
- Dyffryn Clwyd Forum.
- Work also continues across the 6 Opportunity Catchments: Cleddau & Milford Haven, Conwy, Swansea Bay, Teifi, Anglesey and Clwyd. There are also projects through the Marine Opportunity Catchment which has been working mainly in the Cleddau and Ynys Môn but also Clwyd and Swansea Bay. An evaluation of Opportunity Catchments is ongoing to help shape the focus of the work for the final RBMPs.
Supporting information section 1
- Links to other parts of the plan and information for the Western Wales RBD and Dee RBD
- More detailed maps and information regarding the RBD is available on Water Watch Wales
- For further information on who manages and who is involved with the RBD see the Technical Annex, section 3.3
- To respond to this consultation please see our Citizen Space page
1.1 Impact assessments
NRW has carried out the Strategic Environmental Assessment (SEA) of the Programme of Measures (national measures and water body measures). The SEA has informed the development of the draft RBMP. The Environmental Report has been undertaken at a strategic level and is used to identify likely significant effects, both positive and negative, as well as recommendations for mitigation of negative effects and opportunities to improve the plans through an iterative and interactive process. The RBMPs are fundamentally aimed at improving the water environment. The SEA must ensure that any negative effects are avoided, reduced or mitigated and seek to maximise positive effects.
A draft Habitats Regulations Assessment accompanies this consultation.
NRW has also completed a Health Impact Assessment for Wales covering the Western Wales RBMP in accordance with the requirements of the Health Impact Assessment (Wales) Regulations 2025. The findings have been used to inform the draft RBMP development, Environmental reports and Equalities Impacts Assessment.
Supporting information section 1.1
- Interim Programme of Measures Progress Review
- Environmental Report
- Draft Habitats Regulations Assessment of the draft Western Wales RBMP
1.2 Progress review 2021 to 2025
The River Basin Management Plans 2021-2027: Interim Programme of Measures Progress Review was published in October 2025. A review of progress throughout the 6 years of cycle 3 will be included in the final RBMP.
Overall, for the Western Wales RBD the status of the Programme of Measures is on track. Included are the 6 Opportunity Catchments, which aim to focus actions that are required to deliver Water Framework Directive Regulations 2017 (WFDR) outcomes, wider benefits to the water environment and contribute to well-being goals. Through the Marine Opportunity Catchment, work has mainly been carried out in the Cleddau and Ynys Môn, but also Clwyd and Swansea Bay. You can see the actions within these projects here, and some of these are also available geospatially on the River Restoration Portal.
A lot of progress in implementing measures has been carried out across the RBD, and whilst the Opportunity Catchments have focused on 6 geographical areas, work has been delivered across the whole of the RBD. Work included targeted interventions, including fencing, hedge planting, riparian habitat improvement, improved cattle crossings and sustainable drainage schemes, which have been carried out using funding through the Water Quality Capital Programme. Additionally, the Four Rivers for LIFE project has carried out similar additional work within the Cleddau and Teifi Special Area of Conservation (SAC) river catchments. Alongside these initiatives, the Teifi catchment Demonstration Project is also contributing to the catchment approaches within the RBD. Projects in the marine environment have been working on improving water quality and reducing nutrients to saline lagoons (SAC features), coastal waters, and estuaries. NRW has worked in collaboration with many stakeholders to achieve joint aims for water across the RBD.
NRW also continues to carry out a programme of investigations to find out why many water bodies are not at good status or potential and plan water body measures to achieve good status/potential. Our knowledge and understanding of the issues affecting water bodies has increased significantly and will continue to develop through cycle 4. As a result, NRW are now in a better position to work with our partners to identify where the greatest environmental improvements can be made, which will provide the most benefit to everyone.
Supporting information section 1.2
1.3 Changes for cycle 4
Each cycle of updating the RBMP considers of any changes, these are set out in the draft RBMPs and are primarily associated with technical aspects of the plan such as how NRW determine the classification status of the RBD.
Proposed water body changes
For cycle 4 some water bodies will be amended, a summary is below:
- In Western Wales RBD there is a proposed merge of 2 river water bodies, Dysynni lower (GB110064048440) and Tywyn main drain (GB110064048310)
- Changes to water body names
- Water body boundary changes
- The designations of several heavily modified water bodies will be amended
Full details are in the Technical Annex, Appendix A.
Changes to protected areas
For cycle 4 some of the protected areas have been amended, a summary is below:
- One new nutrient sensitive area, under the Urban Wastewater Treatment (England and Wales) Regulations 1994, has been designated during cycle 3, Milford Haven Inner water body in 2025.
- Seven new Bathing Waters have been designated in Western Wales RBD since 2021, including a new inland bathing water at The Swing Bridge on the River Tywi at Llandilo.
- Shellfish Water Protected Areas are being reviewed in 2026 and any proposed changes will be consulted on separately by Welsh Government and included in the final RBMP.
The Protected Areas Register for Wales will be updated as part of the final RBMP and maps updated on Water Watch Wales.
Changes to water quality targets for 2 river water bodies on the River Cleddau SAC and one on the River Teifi SAC are included as part of this consultation. Changes to lake SAC water quality targets are also included, for details refer to the Technical Annex, Section 4.3 and Water Watch Wales.
Changes to the Programme of Measures
The most significant change to the Programme of Measures is the requirement to include measures at the water body scale as clarified by the Court of Appeal judgement (Costa Beck judicial review). The approach for this work has been set out in the Technical Annex and a summary included in Section 3 below.
Supporting information section 1.3
- Changes to water bodies and designation of artificial or heavily modified water bodies Technical Annex Appendix A
- Changes to protected areas, Technical Annex section 4.3
- Approach taken for the cycle 4 Programme of Measures, Technical Annex section 6
1.4 Why this plan matters and what it will aim to achieve
The updated Western Wales RBMP provides an opportunity to assess and review the status of the RBD alongside setting out the measures that are needed for the next 6 years. It aims to progressively reduce the number of elements failing in water bodies and improve the overall condition of water bodies, by addressing the multiple pressures across our failing water bodies.
The impacts of climate change on our landscape and seascape are already evident, with storms, drought, record-breaking temperatures and wildfires. These can make the pressures of pollution from our everyday activities, land management and past more pronounced. Biodiversity is under pressure, salmon is predicted to be locally extinct in some Welsh rivers by 2030.
Managing natural resources across landscapes, in an integrated way will provide opportunities to deliver multiple benefits. There are already many good examples of partnership working and these need to be built on. NRW need to ensure that the objectives for RBMPs are integrated in other plans and policies. This must involve Flood Risk Management Plans, Water Company Business Plans, Shoreline Management Plans and the sustainable farming scheme, this plan forms part of the Area Statements.
Over the next 6 years this plan will:
- Seek to work collaboratively across the Western Wales RBD from source to sea to maximise opportunities and outcomes through the work NRW and others do
- Continue to provide some focus in areas such as through the 6 Opportunity Catchments, The Teifi Fyw - Living Teifi: People and Nature Together project and the Four Rivers for LIFE project and use these to inform future integrated catchment approaches in Wales
- Continue to deliver the Welsh Government funded Water Quality Capital Programme funding existing projects like Swansea Sponge City, improving marine water quality and river restoration project development and also planning ahead for future project work delivering positive outcomes across the Western Wales RBD
- Use the water body measures work to better address the causes of failures in our waters
- Support the delivery of measures by using innovation and tools such as Programme of Measures Power BI and heat maps to help prioritise and act
- Continue using data and evidence to inform the understanding of the problem so that the appropriate measures can be applied maximising on opportunities that arise.
- Act to address continued challenges from a broad range of pressures including excess nutrients, spills from storm overflows, chemicals and the challenges resulting from climate change
- Act to achieve the higher water quality standards required for the most sensitive protected areas including the Teifi, Twyi, Cleddau, Gwyrfai and Eden SAC rivers and priority marine SACs
- Use this RBMP to influence and inform future Water Reform ‘Shaping the Future of Water Governance in Wales’ ensuring lessons can be learnt from the work that has been undertaken since the first RBMP in 2009 and ensuring the longevity of the aspirations within this plan
- Bring a focus on the everyday actions everyone can take so the plan includes useful tools to support wider community involvement
Supporting information section 1.4
- Approach taken for the programme of measures Technical Annex section 6
- Programme of Measures and protected areas – Water Watch Wales
- Programme of Measures Power BI
2. State of the water environment
This section looks at the current state of the water environment and provides a summary of the status of the waters in the Western Wales RBD based on the current classification. The classification will be updated for the final RBMPs which will be published in December 2027. Reasons for not achieving good status or potential (the minimum objective for water bodies) are also summarised, these help inform measures which are required during the timeframe of this plan to achieve our objectives.
2.1 Status of water bodies
Water body status is determined through classification and this draft RBMP uses the cycle 3 Interim Classification (2024) for surface waters and groundwaters use the cycle 3 Classification (2021).
Overall status
In the Western Wales RBD 44% of water bodies achieve good or better overall status.
Table 1 Overall status for water bodies
|
Water body type |
No. of water bodies |
High |
Good |
Moderate |
Poor |
Bad |
|---|---|---|---|---|---|---|
|
River |
426 |
0 |
204 |
179 |
36 |
7 |
|
Lake |
61 |
1 |
17 |
29 |
13 |
1 |
|
Estuary |
28 |
0 |
5 |
22 |
1 |
0 |
|
Groundwater |
25 |
0 |
13 |
0 |
12 |
0 |
|
Coastal |
23 |
1 |
6 |
16 |
0 |
0 |
|
Canal |
3 |
0 |
2 |
1 |
0 |
0 |
|
Total |
566 |
2 |
247 |
247 |
62 |
8 |
Figure 2 Overall status
Element level status
For each water body the overall water body classification is made up from individual chemical, biological and physical elements. The one out, all out approach is used to classify water bodies so the lowest element classification drives the overall classification. This ensures that overall ecological status is the driver for improvement rather than prioritising individual elements. Morphology and hydrological regime are supporting elements. They classify as either "high" or "not high".
The 2024 data for all water body types in the Western Wales RBD shows that 90% of elements are at good or better status. This can be split into the different water body types: 88% for rivers, 87% for lakes, 79% for estuaries, 84% for canals, 90% for coastal and 91% for groundwater bodies.
Figure 3 Western Wales RBD element level status
Ecological status
There are 541 surface water bodies in the Western Wales RBD. Table 2 and Table 3 below show the number of water bodies in each status.
Table 2 Ecological status for surface waters (assessed water bodies)
|
Water body type |
No. of water bodies |
High |
Good |
Moderate |
Poor |
Bad |
|---|---|---|---|---|---|---|
|
River |
426 |
0 |
213 |
170 |
36 |
7 |
|
Lake |
61 |
1 |
17 |
29 |
13 |
1 |
|
Estuary |
28 |
0 |
7 |
20 |
1 |
0 |
|
Coastal |
23 |
1 |
10 |
12 |
0 |
0 |
|
Canal |
3 |
0 |
2 |
1 |
0 |
0 |
|
Total |
541 |
2 |
249 |
232 |
50 |
8 |
Table 3 Chemical status for surface waters
|
Water body type |
No. of water bodies |
Pass |
Fail |
|---|---|---|---|
|
River |
426 |
390 |
36 |
|
Lake |
61 |
61 |
0 |
|
Estuary |
28 |
22 |
6 |
|
Coastal |
23 |
16 |
7 |
|
Canal |
3 |
3 |
0 |
| Total |
541 |
492 |
49 |
Groundwaters – status
Of the 25 groundwater bodies in the Western Wales RBD all achieve good quantitative status and 13 achieve good chemical status.
Supporting information section 2.1
• Assessment of water body status, Technical Annex section 4.2.3
• Maps on status and classification data Water Watch Wales
2.2 Significant water management issues in the Western Wales river basin district
Reasons for not achieving good
Where an element is classified at less than good status or potential, or has deteriorated, NRW carries out an investigation to identify the cause of the failure or deterioration. These are recorded using a defined set of reasons which are used to identify appropriate measures.
Significant water management issues
NRW have used the reasons for not achieving good data to identify the most important issues that threaten the current and potential future uses of the water environment. These are known as the Significant Water Management Issues (SWMIs), these were consulted on in our 2026 Challenges and Choices Consultation. The breakdown in Western Wales is as follows:
- Physical modifications (69 water bodies)
- Pollution from rural areas (111 water bodies)
- Pollution from wastewater (92 water bodies)
- Pollution from towns, cities and transport (61 water bodies)
- Pollution from abandoned mines (41 water bodies)
- Changes to the natural flow and level of water (17 water bodies)
- Natural (17 water bodies)
- Other (10 water bodies)
These figures represent a snapshot in time from April 2026. As further investigations are undertaken and measures completed on the ground the dataset is updated. There are failures due to suspect data which are being investigated. Other failures can include the time needed for the ecology to recover after intervention and where natural barriers such as waterfalls limit fish movement.
Supporting information section 2.2
- Reasons for not achieving good, Technical Annex section 4.4.1, dataset Water Watch Wales
- More detail on Significant Water Management Issues, Technical Annex section 4.4.2
- More detail Pressures, Technical Annex section 4.4.3
- More detail on Our consultation process, Technical Annex section 7
- Water Watch Wales
3. Objectives and measures
This section summarises the objectives and Programme of Measures and draws out how these, alongside our understanding of the challenges and cost, could be implemented during 2027-2033, these will be updated for the final RBMP.
3.1 Setting objectives
This plan sets out what NRW intends to achieve by 2033 to meet the statutory objectives:
- Prevent deterioration in status - Water body status will not be allowed to deteriorate
- Achieve the objectives for Protected Areas - Achieve the standards set by the relevant legislation under which they were designated. For water dependent European sites, work will continue towards achieving conservation objectives.
- Aim to achieve good overall status/potential for surface waters and ground waters - Implement measures to achieve good overall status where they are technically feasible and not disproportionately costly
This is identified by setting an objective for each water body and quality element. The detailed outcomes of this information can be accessed at Water Watch Wales and a more detailed description of the approach is provided in the Technical Annex.
As required under WFDR NRW aims to implement measures to achieve good overall status/potential for surface and groundwaters by 2027. Alternatives to that objective are allowable which may result in 2 additional options:
- an objective of less than good by 2033 (less stringent objective) due to technical infeasibility (no known technical solution is available) or disproportionate cost (unfavourable balance of costs and benefits)
- or an extended deadline of good status/potential to, or beyond 2033 for reasons of natural conditions (ecological recovery) or technical infeasibility for a small number of chemicals
For each protected area, other than shellfish water protected areas, the objective is to achieve compliance with any standards/targets and objectives required by the relevant Regulations for which the area or body of water is protected. For European sites the objective is to achieve favourable condition. Where 2 or more objectives apply to the same body of water, or the same part of a body of water, the most stringent objective applies. When setting a WFDR objective for a water body that is at less that good status, it is not acceptable for the WFDR objective to undermine those of other protected areas such as European sites.
All objectives must be reviewed for every planning cycle as new evidence and measures to resolve environmental pressures become available. Of the 566 water bodies 62 have an objective of less than good status or potential on the basis of them being disproportionately costly, or technically infeasible to improve to good status over the cycle 4. In these water bodies some national and water body measures will be taken to improve the water quality and contribute towards Sustainable Management of Natural Resources (SMNR) values. If significant SMNR values would be accrued, or downstream catchment benefits gained as a result of further intervention, then they will be encouraged. However, it is unlikely that measures over one cycle will be sufficient to result in a classification status change. No deterioration remains an objective for these water bodies.
The disproportionate cost assessment has been made on 225 water bodies in Wales, including 119 in the Western Wales RBD which it has been possible to collate costs for. Since publication of the second RBMP the Environment (Wales) Act 2016 and Well-being of Future Generations (Wales) Act 2015 allows us to consider benefits of improvement in water quality that the benefits valuation for the WFDR may not include, such as using mine water remediation to heat local homes. For this reason, measures in water bodies that are calculated to be disproportionately costly for the WFDR requirement may still be progressed if it is demonstrated that there are wider and significant SMNR values that would be accrued.
Figure 4 shows the 119 water bodies considered for economic assessment across the Western Wales RBD, ranked on the x-axis from the most cost-beneficial to improve to the least cost-beneficial. The blue bars represent the cost-benefit ratio for each water body, while the orange line shows the cumulative cost of achieving good status or good ecological potential. The cumulative cost rises gradually for the most cost-beneficial water bodies before increasing more sharply for a relatively small number of higher-cost interventions, demonstrating the influence of a limited number of expensive improvement schemes on overall programme costs.
The total estimated cost of improving the 225 assessed water bodies across Wales is approximately £590 million. Of this, the Western Wales RBD accounts for 119 costed water bodies with an estimated cost of £335 million. As with previous assessments, these figures represent only water bodies for which costs have been quantified, and the overall cost of achieving objectives across all water bodies is likely to be higher. Delivery of improvements will also depend on the availability of appropriate regulatory mechanisms, land access, partnership opportunities and the technical feasibility of addressing the identified pressures.
Figure 4 shows the 119 water bodies considered for economic assessment in the Western Wales RBD, ranked from the most cost-beneficial to improve to the least cost-beneficial. The blue bars show the cost-benefit ratio, and the orange line shows cumulative improvement costs.
Supporting information section 3.1
3.2 Summary of the draft programme of measures
This section sets out a summary of the cycle 4 draft programme of measures. These are informed by new evidence and information from current and previous cycles. These will be updated, as required, following the outcome of this consultation and the release of final classification which will be in 2027. For cycle 4, the RBMPs include water body measures for individual water bodies which is a requirement clarified by the Court of Appeal judgement (Costa Beck judicial review). The approach for the programme of measures is set out in the Technical Annex. The draft programme of measures include:
National measures - These usually apply to the whole of Wales, England and Wales, or the United Kingdom. In general, these set the legislative, policy or strategic approach and support, or are critical to, local delivery and environmental outcomes. They also include some of the main delivery programmes. For example, a national ban on using a particular chemical or a national strategy for prioritising and funding the remediation of abandoned mines. There are 54 national measures in Wales, this includes 6 new measures for cycle 4, they are here on the programme of measures Power BI.
Water body measures – These measures apply to a specific water body and directly address a reason for not achieving good status/potential (RNAGs) or reason for deterioration (RfDs). Water body measures also include investigations where a failure and RNAG / RfD is yet to be confirmed. These are here on the programme of measures Power BI.
For cycle 4 the programme of measures has been grouped under delivery mechanisms:
- Regulation (legislative mechanisms)
- Strategic plans
- Financial incentives
- Partnerships
- Investigations
- Water company investment (National Environment Programme - NEP)
- Research, demonstration projects or pilots
- General education, advice campaign or scheme
More information to the legislative means to implement measures is available through Legislation.gov.uk.
The programme of measures can be delivered via several key national programmes of work:
- NRW’s WFDR driven programmes
- Catchment scale approaches from source to sea including work through river restoration, sustainable fisheries opportunities and the Four Rivers for LIFE project
- Nutrient Management Boards
- Flood and coastal risk management
- The NEP which includes delivery of the storm overflow and the water resources restoring sustainable abstraction programme
- Sustainable Farming Scheme and National Forest for Wales
- Welsh Government Nature and Climate Emergency Capital Fund and the Opportunity Catchments and the National Peatland Action Programme in Wales
A source to sea approach should be taken to aim to integrate these programmes to maximise the opportunities and benefits.
Many of the measures have multiple benefits, following the principles of SMNR. For example, sustainable drainage systems can help to reduce diffuse pollution, reduce surface run-off and flood risk, and deliver biodiversity through green infrastructure rather than hard engineering.
Within the RBMP these are organised under the significant water management issues, a summary is included below.
Achievement of WFDR objectives requires combinations of measures to be delivered across many sectors and organisations, as partnership projects as well as by the public – everyone has a role to play.
Summary programme of measures by significant water management issue for the Western Wales RBD
Physical modifications
Summary of national measures:
- Flood Risk Management activities
- Shoreline Management Plan policy for coastal defence management
- Sustainable Fisheries Programme
- The Climate Resilient Fisheries Strategy
- Water Company Asset Management Programme (AMP) including NEP commitments
- River Restoration Programme
Summary of water body measures:
- Resolve impacts caused by barriers to fish migration and natural continuity in river and tidal channels (e.g., dams, weirs, culverts, sluices, tidal gates)
- Resolve impacts of operational and maintenance activities in river and tidal channels managed for flood and coast protection
- Improve insufficient flow regime (baseline flow quantity or flow variability) downstream of water storage impoundments
What these measures will aim to achieve:
- Where physical modifications are essential to provide important human uses, such as drinking water supply or flood protection, ecological impacts caused by the modifications must be mitigated without causing significant adverse impact on these uses.
- Four Rivers for LIFE Project delivered in the Teifi, Twyi and Cleddau SAC rivers and after LIFE Plan in place
- Deliver the NRW river restoration programme
- Continue to address barriers to fish migration in catchments
- Increase catchment resilience to make fish populations more resilient to pressures, including climate change
- Target nature-based solutions for physical modifications on the coast
- Deliver Water Company NEP / AMP commitments (AMP8 and AMP9)
Managing pollution from wastewater
Summary of national measures:
- Water Company AMP including NEP commitments
- Drainage and Wastewater Management Plans
- Nutrient management plans for the SAC river catchments and catchment nutrient recovery plans for prioritised marine SACs
- Sustainable Drainage Systems
Summary of water body measures:
- Where required preview/amend permits to reduce impact of discharges
- Ensure septic tanks are compliant with regulatory requirements, follow advice and guidance on maintenance
- Deliver improved discharge quality/reduce spills from all intermittent point source discharges e.g. storm overflows
- Deliver action(s) identified in the NEP / AMP to restore SACs towards favourable condition
What these measures will aim to achieve:
- Deliver the Water Company NEP / AMP commitments (AMP8 and AMP9)
- Reduce pollution risks and the negative impact of pollution from sewage and waste water on biodiversity by 2030 (Welsh Government Environment (Principles, Governance and Targets) Act 2027)
- Sewerage systems including storm overflows, are maintained or improved so they operate effectively and their impacts on the water environment, from source to sea are minimised
- Water company sewage discharges to SAC Rivers and priority marine SAC catchments meet their nutrient standards
- Deliver an integrated approach to excess nutrients at a catchment scale
- Solutions to storm overflow problems that deliver multiple benefits are embedded in planning and development across the RBD (e.g. water sensitive urban design, sustainable drainage schemes) and central to the Drainage and Wastewater Management Plans
- Increased public awareness of the impacts of misconnections and disposal of harmful substances into sewerage systems (e.g. paint, oil, fats and garden chemicals)
- Maintain and improve Bathing and Shellfish Waters to promote a thriving tourism and shellfish aquaculture industry
Manage pollution from rural areas
Summary of national measures:
- Sustainable Farming Scheme delivering a programme of incentives, advice and guidance, innovation and improvements to rural diffuse pollution
- Ensure compliance with the Water Resources (Control of Agricultural Pollution) (Wales) Regulations 2021 in Wales
- Nutrient management plans for the SAC river catchments and catchment nutrient recovery plans for prioritised marine SACs
- Water Company AMP including NEP commitments
- Welsh Government target Woodland Management incentives to deliver improvements to the water environment
- The UK Forestry Standard Guidelines (including “Forests and Water” Guidelines), and Practice Guides (including “Managing forests in acid sensitive water catchments”)
Summary of water body measures:
- Ensure chemical products are applied according to manufacturer’s instructions and any waste generated is disposed of appropriately
- Improve land management to ensure that all nutrient and fertiliser applications match soil and crop requirements and reduce soil erosion to minimise nutrient and sediment losses from land
- Reduce nutrient and/or organic loading within the water body to restore SAC towards favourable condition
- Ensure that management complies with the UK Forestry Standard and improve awareness and implementation of UK Forestry Standard and associated practice guides across the forestry sector
- Ensure that soil is managed appropriately preventing and reducing compaction and subsequent erosion caused by vehicle movements and/or livestock poaching/overgrazing
What these measures will aim to achieve:
- The Welsh Governments Sustainable Farming Scheme addresses rural diffuse pollution
- Reduce pollution risks and the negative impact of pollution from excess nutrients on biodiversity by 2030 (Welsh Government Environment (Principles, Governance and Targets) Act 2027)
- Deliver an integrated approach to excess nutrients within the SAC river catchments including a holistic approach to nitrogen deposition integrating both air and water quality impacts
- Deliver the Water Company NEP / AMP commitments (AMP8 and AMP9) including Drinking Water Protected Areas catchment solutions
- Appropriate new woodland creation and forestry management that benefits the water environment and people through outdoor recreation and delivers ecosystem services such as reduced diffuse pollution, reduced flood flows, clean drinking water, habitat for fish and wildlife, and shade in river margins to mitigate the impacts of climate change
- NRW will manage Welsh Government Woodland Estate to meet the UK Forest Standard Forest & Water Guidelines as a minimum
- Rural land management contributes to sustainable, long-term recovery to natural pH conditions in areas where water bodies are compromised by acidification
Managing pollution from mines
Summary of national measures:
- Metal Mine Strategy for Wales
- Mining Remediation Authority programme of work
Summary of water body measures:
- Control and remediate point and/or diffuse discharges from abandoned metal mines
- Control and remediate point and/or diffuse discharges from abandoned coal mines
What these measures will aim to achieve:
- Mitigate the impacts of abandoned mines on the water environment through a strategic work programme across Wales. It will take decades to address all the issues, actions that deliver the best ecological, social and economic outcomes for society’s investment will be prioritised
- Deliver the mine water preventative and remediation programme in relation to coal mines
Manage pollution from towns, cities and transport
Summary of national measures:
- Drainage and Wastewater Management Plans
- Contamination from historic industrial and waste sites
- Control the release of chemicals at source
- Awareness and benefits of managing surface water run-off
Summary of water body measures:
- Maintain and improve sewerage drainage system to rectify misconnections and leaks
- Secure compliance through regulatory controls on emissions with Environmental Permitting (England and Wales) Regulations 2016, Environment (Air Quality and Soundscapes) (Wales) Act 2024 and Environment Act 1995
- Review and where appropriate vary and/or enforce existing Discharge Permits
- Remediation of landfill and extraction/treatment of leachate
- Remediate contaminated land
What these measures will aim to achieve:
- Deliver the Drainage and Wastewater Management Plans
- Minimise the negative impact of historic and future development on the water environment via our role as a land quality consultee in the planning process or, where the planning process is not applicable, by providing advice and assistance to local authorities with their contaminated land inspection strategy
- Implementation of legislation to control the release of chemicals at source
- Put SMNR at the centre of urban design and planning. By using sustainable drainage systems, restoring the areas around rivers and coasts including the riverbanks, floodplain and the intertidal area, providing public green and blue spaces, raising awareness and changing behaviour to improve the quality of life in the urban areas of Wales
- Continue to regulate emissions of acidifying pollutants to allow the water environment to recover
- Continue to work in partnership within the urban environment on community awareness of the impacts of misconnections
Changes to the natural flow and levels of water
Summary of national measures:
- Water Company AMP including NEP commitments
- Welsh Government National Peatland Restoration Programme
- Flood Risk Management activities
- Heavily Modified Water Body mitigation measure review
- Water efficiency including multi-sector demands work
Summary of water body measures:
For the draft RBMP programme of measures, the only water body measures that are included are water resources investigations.
What these measures will aim to achieve:
- Deliver the Water Company NEP and AMP commitments (AMP8 and AMP9) including restoring long-term sustainable abstraction and use of nature-based solutions
- Continue to deliver the Welsh Government National Peatland Restoration Programme
- Encourage sustainable land use patterns in urban and rural environments that reduce runoff from rainfall including nature-based solutions
- Deliver interventions such as in-channel habitat improvement that mitigate the impacts of abstraction on the water environment
- Better understand water demands across sectors
- Through Waterwise continue to improve water use efficiency to reduce the need for additional abstraction in the future
Managing Invasive Non-native Species
Summary of national measures:
- Implementing the updated GB strategy on invasive non-native species (INNS)
- Water Company AMP including NEP commitments
No water body measures
INNS are a pressure across the Western Wales RBD, but they are not the reason any water body is not achieving good status or potential so there are no specific water body measures.
What these measures will aim to achieve:
- Prioritise actions to slow down or prevent the spread of existing INNS
- Minimise the risk posed by INNS through improved biosecurity and local information on INNS distribution and impact
- Deliver the Water Company NEP / AMP commitments (AMP8 and AMP9)
Supporting information section 3.2
- Technical Annex section 6
- National measures, Water Watch Wales and Power BI